Looking ahead to days after the HPC grant, when the group will need to ick up the cost of the link again, Pui Hin pointed out that:
As a result, we will be able to get good bandwidth at reasonable cost.
Note:
On the upgrade of 10BASE2 to 100BASE-T HP, Pui Hin has found out from Ron Koehler that offices for the new facilties: Subaru, Gemini and SMA, will be constructed out of the current conference room and the janitor room next to it. Two sets of 2 twisted pair cables will be pulled into the current conference room and another set into the janitor room.
Note: